facebook
linkedin
youtube
X
en v co-funded by the eu_neg

This project is co-funded by the EU LIFE Programme under GA Nr. 101074321. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union. Neither the European Union nor the granting authority can be held responsible for them.

#fountaineuproject

Privacy & Cookie Policy

© A.I.F.M.

dbbec6d4dc5e1dbfeede18bfa8d91e2194183c59

News on detail

EREDI DI BONACINA MARIO SRL JOINS THE LIFE FOUNTAIN FAMILY

29-07-2024 07:53

Fountain Consortium

EREDI DI BONACINA MARIO SRL JOINS THE LIFE FOUNTAIN FAMILY

EREDI DI BONACINA MARIO SRL JOINS THE LIFE FOUNTAIN FAMILY

3f6bb57987a6ca7c07fd070195f6a3135957652e.jpg

The LIFE FOUNTAIN project has the purpose of realizing a PFAS treatment plant based on Functionalized Magnetic Sponges for PFAS absorption. One of the demonstration activities consists of the testing of the PFAS treatment plant in the Gaser TC premises to treat the groundwater (affected by PFAS pollution) used in its plating lines and, then, to treat the industrial wastewater obtained as the result of the plating process. 

 

Gaser TC premises was selected for the well, considering that the aquifer in many areas of Vicenza province is polluted by PFAS and there is the need to remove such contaminants before the use of water, even for industrial needs. In Italy, the realization of a drilled water well must be authorized by local authorities through a long bureaucratic process.

 

In 2021, Gaser TC submitted to the local administration an authorization request to dig a well to draw groundwater for industrial use. Unfortunately, in July 2023 the authorization was denied, so Gaser TC can’t access to groundwater affected by PFAS pollution and, consequently, it will not be able to run the demonstration activities in its premises.

 

After evaluating different options, the Consortium proposed to change the site for the drilled water well.


Thankfully, the Grant Management Services of the European Commission gave a positive feedback to our request.


So, we are glad to welcome a new partner in the LIFE FOUNTAIN Consortium!
 

The new member is EREDI DI BONACINA MARIO SRL (ErediBon), placed in Caravaggio (Bergamo); belonging to Gruppo Gaser, ErediBon is specialised in zinc and zinc-nickel plating of mechanical parts.
In its premises an industrial metallization plating line is already provided with water coming from a drilled water well.


Consequently, Eredi di Bonacina Mario will be responsible to run the demonstrator treatment plant in order to treat the water from the existing well and to remove PFAS prior the use of such water in the existing plating lines. The concentration analyses of water directly from the existing well, after treatment with FOUNTAIN technology and at the end of plating lines, in combination with in-situ monitoring, will confirm the capability of FOUNTAIN technology to eliminate PFAS from polluted waters.